Chris and Sumaya wanted a composite deck installed and chose the Nex Gen Decking using the Ipe Colour.

We agreed to start construction as soon as their new pool was installed; that way we had a correct level of the marble to work with.

We have now completed this job just under three days and boy that is look good. The Pool guys did the marble floor which we used as our level and we ensured all was level. It was pretty tricky to get the joists laid out as the pavement was not level at all. However once we got it all levelled out, we had fun installing the Nex Gen decking boards.

We would like to thank Chris and Sumaya for their hospitality while we were working on the job. Their children were fun too to be around.

We hope they enjoy the deck with their kids for many years to come.

This job to supply and framework and the Nex Gen decking in the Ipe colour – $10874 inc GST

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s